contact@sydensen.com

About Us

  • Q How long is our delivery time?

    A
    It depends on the order quantity and manufacture process, for machining process, we can do 10 working days.
    For casting process, the delivery samples within 25 working days,50 working days for mass production.
  • Q How about your order process ?

    A
    When we receive the order, the first step is to have order review meetings with 6 department 
    include Sales department, Technical department,Purchasing department,Production department,Quality control department,Order follow up department to ensure all is clear and the order can going smoothly.
  • Q Why choose densen group?

    A With 30 years of production experience and 14 years of international trade experience,Densen Group has a good understanding of international trade laws and regulations, is familiar with international quality systems and international technical standards, participates in and supervises the production of the factory throughout the pre-production, middle and post-production, and inspects the products before delivery. Conduct inspections to help customers control risks to the greatest extent and ensure the reliability and stability of supply quality.
  • Q Advantages of Densen Group?

    A Provide casting and forging product solutions: provide customers with product process optimization and redesign services, provide product pre-production technical solutions and process confirmation reports, provide product production process control reports and time progress reports, and provide various inspection services before product delivery and Specific reports, providing product quality life-long tracking and service.
  • Q Advantages of Densen Group?

    A There are many fields, and the products involve many fields such as medical treatment, aviation, railway, locomotive, oil and gas, metallurgy, mining, machine tools, and instruments.
  • Q Are we a factory or a trading company?

    A We are a manufacturer with 5 factories and more than 50 cooperative factories, we focus on customers’ request, and give the best solution accordingly.
  • Q Briefly introduce Densen Group?

    A We specialized in manufacturing custom parts,process can be casting,forging,machining,stamping and fabrication since 1992. Products unit weight from 0.01kg to 240tons. mainly exported to USA and Europe.
  • Q Why choose Densen Group?

    A Focus on casting and forging manufacturing for 30 years, aim to be first casting and forging solution provider.50% of Densen's customers are from Fortune 500 list.
  • Q How many people does our company have?

    A There are 50 people in the group headquarters, and the total number of people is about 800 if the factory is added together.
  • Q How do we do quality control?

    A We have our own QC team, go to the site to supervise the production process, and report the actual production progress to customers every week. After passing the factory inspection, the third party conducts final inspection on the product again and issues a formal report to report the objective results, taking full responsibility for the quality.

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer