The characteristics of the track ball valve of imports

Views: 13     Author: Site Editor     Publish Time: 2016-11-29      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button
The characteristics of the track ball valve of imports

Import orbit ball valve is suitable for the petrochemical industry, liquefied petroleum gas storage, oil refineries, natural gas, compressor, oil and gas pipeline system, light industry, textile and other industries.
Import the characteristics of the track ball valve:
 
1, the opening and closing without friction.This function completely solve the traditional valve for sealing surface friction each other and affect the sealing problem
2, the structure of the jacket type.The valve can be directly mounted on the pipeline on-line inspection and maintenance.Can effectively reduce the parking device, reduce the production cost
3, single seat design.To eliminate the influence due to abnormal pressure valve lumen medium use safety problems
The characteristics of the track ball valve of imports
4, low torque design.Special structure design of the valve stem, only with a small hand wheel can be easily opening and closing of the valve
5, wedge seal structure.Valve by valve stem provides mechanical force, wedge pressure the ball into the seat and seal.The valve sealing performance is not affected by changes in the pipeline pressure difference, under various conditions sealed performance has a reliable guarantee
 
Above is about import ball valve related introduction of the characteristics of the orbit, hope can help to you.

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer