contact@sydensen.com

Steel pressure vessel welding procedure qualification conditions

Views: 6     Author: Site Editor     Publish Time: 2016-10-27      Origin: Site

Steel pressure vessel welding procedure qualification of general provisions, you may have not been very clear, let's take a look at.
Steel pressure vessel welding procedure qualification conditions
1, the welding procedure qualification should be based on reliable steel welding performance, and completed before the product welding.
2, general welding procedure qualification process are: welding process procedure and welding specimens and test, the test specimen and the specimen, determine whether welding joint has required the use of performance, make the welding procedure qualification report to assess the proposed welding process instructions.Welding procedure qualification test welds unit the correctness of the proposed welding process, welding unit capacity and evaluation.
3, the cross section of the penetration of T joint and the joint Angle, when unable to detect internal defects, and manufacturing units do not have enough ability to ensure that the weld penetration, should add production type testing of welding procedure qualification, confirmed by the dissection test can allows the welding products.
4 used equipment, instrumentation, welding procedure qualification should be in normal working state, steel, welding materials must conform to the corresponding standards, by this unit skilled welding workers have been using this unit welding equipment welding specimen.
Steel pressure vessel welding procedure qualification conditions
The above is the welding procedure qualification for steel pressure vessel conditions of related introduction, hope can help to you.

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer