Requirements on the casting mold parts

Views: 0     Author: Site Editor     Publish Time: 2016-06-17      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

Part of the technical requirements on the one hand affect the performance of the parts, on the other hand is directly related to economic and feasibility of machining process. People often ask casting mold parts processing which technical requirements, the following simple analysis of this issue.
Die cast parts
1. The size of the part surface machining accuracy;
Die cast parts
2. The shape of parts machining accuracy;
Die cast parts
3. The parts of the surface roughness of the processing;
Die cast parts
4. The mutual position precision between surfaces of parts;
Die cast parts
5. parts processing hardness and heat treatment requirements;
Die cast parts
6. Other special requirements.
Die cast parts
In general the process of machining the part, the part surface after the machining accuracy is improved, but also get smaller surface roughness due to surface roughness of parts worth decreased, while increasing the cost of processing. Thus, the operator in determining the precision, the first part of the performance requirement is to ensure that, taking into account also the cost of parts and manufacturing process conditions and many other factors.

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer