contact@sydensen.com

Northeast 2018 Elite Final competition ended successfully

Views: 9     Author: Site Editor     Publish Time: 2018-09-07      Origin: Site

Northeast 2018 Elite Final competition was held on August 30, 2018.

This competition is held once a year, and six chamber of commerce from northeast China, eleven elites competedfiercely on behalf of the highest standards in their respective regions.


Shenyang New Densen, as China top investment casting manufacturer, represented the Shenyang Chamber of commerce to attended the competition. And No. 2 player Hannah Bao represent New Densen took part in the competition.


The elites have fully demonstrated their professional knowledge, language charm and insights on alibaba platformoperation and cross-border e-commerce.


No. 2 player Hannah Bao from New Densen had an excellent speech about the ‘Mast the flow rate’, which shows the beautiful and confidence of New Densen.


Hannah Bao used the humorous style,the rich speech has won all judges the consistent high praise, and finally won the popularity king!

Let us congratulate Hannah Bao, congratulate New Densen, congratulate Shenyang chamber of commerce!

Along the way are full of harvest, for you, for New Densen, for Shenyang chamber of commerce, we worked hard and look beautiful!


  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer