Matters needing attention in aluminum alloy die casting

Views: 1     Author: Site Editor     Publish Time: 2016-11-07      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

Aluminum alloy die casting products is mainly used in electronics, automobile, motor and some of the communications industry, etc., of course the main purpose or on some equipment parts, then we need to be paid attention in aluminum alloy die casting club?
 
A, consider the problem of demoulding,
 
Second, the consideration of aluminium alloy die casting wall thickness, the thickness of the too much gap to fill
 Matters needing attention in aluminum alloy die casting
Third, try to avoid in the structure leads to the mould structure of complex structure, have to use multiple core pulling or spiral core pulling
 
Four, some die casting appearance may have special requirements, such as fuel injection
 
Five, mould into consideration when the design, if there are multiple location of core-pulling, put on both sides, as far as possible had better not put in the core pulling, such long time under the aluminum alloy die casting core pulling.
 

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer