contact@sydensen.com

Liner stainless steel compound steel pipe welding process

Views: 7     Author: Site Editor     Publish Time: 2016-09-14      Origin: Site

Liner stainless steel compound steel pipe (304 + Q235B) is a new kind of composite pipe material, corrosion resistance, high temperature resistant, high extensibility, high strength etc., are widely used in the new construction and expansion of process pipeline of petrochemical plant.The pipe material the use of the biggest problem is that at the grass-roots level and composite layer of fusion welding problem completely.To get good welding effect, the correct welding method is:
Liner stainless steel compound steel pipe welding process
1, welding preparation
Before welding will contact layer of paint, clean up dirt and oxide layer, so as to avoid the welding process impurities heat will decompose into H2O and CO2.
Even before welding to preheat at the grass-roots level and composite layer.Preheat the electrical heating method, with the center line of the counterpart as a benchmark, on both sides of the wall thickness is not less than three times, and not less than 50 mm, and prevent overheating.
Liner stainless steel compound steel pipe welding process
2, the welding process
Welding compound layer first, then at the grass-roots level, flow, sealing, backing welding, the transition layer -- - filling layer cover surface.
1) pipe butt welding set pair, its inner wall should flush, the lining of the wrong side volume shoulds not be more than 10% of wall thickness, and should be 2 mm or less.
2) welding, should try to use multilayer welding, the welding layer of weld joint should be staggered, bead shoulds not be too wide too thick.
3) some solid welding tube must be filled with argon, to ensure the weld quality.Position of backing weld, overhead welding using the wire filling, vertical and flat position is welding with the external wire filling method.
4) should be in arc of groove, prohibited in the arc welding parts, arc should guarantee the weld penetration and fusion, should fill arc crater and when arc welding at the end, should reduce the argon gas flow, prevent pressure, ambassador weld sag.
5) level with tungsten wire cannot contact or directly into arc arc column area, to prevent the destruction of arc stability and produce tungsten inclusion defects, welding wire end not exit reserves, prevent the oxidation of the wire.
6) between temperature should be controlled under 150 ℃, the construction of the welding seam on both sides of the water cooling method, the wet towel wrapped in 80 mm on both sides of the outside steel pipe from weld, the weld has dropped below 150 ℃ as soon as possible.
Liner stainless steel compound steel pipe welding process
3, after welding
After welding should be carefully clean up the welding slag on the surface of the weldment, flash splash and other debris and partial response to weld repair when necessary.To eliminate residual stress after welding, should be after heat treatment, welding processing should be carried out in accordance with the design requirements, local heat treatment, appropriate USES electric heating method.At the grass-roots level shall be in accordance with the requirements of basic material of welding post-processing choose heat treatment temperature, other parameters according to the stainless steel inner liner pipe total thickness (7 + / - 1.5) mm.

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer