Forging blank mould parts

Views: 1     Author: Site Editor     Publish Time: 2016-09-12      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

By forging can make material organization close, carbide distribution and flow distribution is reasonable, to improve the performance and heat treatment increases the service life of dies.Casting mould parts are generally after forging processing and forming of the blank, is the purpose of the forging can get certain geometry, to save raw materials and save the processing time, reduce the cost.
Forging blank mould parts
In the face of the mold of main work parts, especially in the heat treatment quality is higher, longer service life of parts, such as convex and concave die of punching die, forging die, plastic mould, die-casting mould cavity, in addition to the requirements to get a certain geometry, save raw materials and reduce processing time, mainly through forging to improve the performance of raw materials as the main goal.Especially in the main working parts, mould parts, therefore, have to pass before processing forging processing, mold can be long time to serve the public.
 

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer