Five measures of full welded ball valve welding deformation

Views: 0     Author: Site Editor     Publish Time: 2016-08-24      Origin: Site

All welded ball valve in the welding process will produce about body and body seat with location in the size of the deformation, in order to prevent welding deformation, so the welding process should take effective preventive measures, a total of 5 points, specific as follows:
Five measures of full welded ball valve welding deformation
1,Full welded ball valve welding should be used when the high energy source of heat.
2,Choose reasonable technological parameters and groove form and the low energy input.
3, Restrictions, and narrow welding heating area, forced cooling water or copper plate weldments.
Five measures of full welded ball valve welding deformation
4, Selection of fine wire, low speed, control temperature in each layer between 50 ~ 80 ℃.
5, Reasonable arrangement of assembling and welding sequence.
Five measures of full welded ball valve welding deformation
The above is all welded ball valve several effective methods to welding deformation, hoping to bring help to you.

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer