loading

Share to:
sharethis sharing button

OEM pipe clamp , metal stamping part

Type: metal stamping parts
FOB Price:US $0.5-50 / Piece
Min. Order Quantity:2000Piece
Supply Ability:10000Set/Pieces per Month
delivery time:Shipped in 45 days after payment
piston ring weight:customized
Port:Dalian
Payment Terms: L/C,T/T, Western Union
Place of Origin: Liaoning, China (Mainland)
Quantity:
  • OEM

  • OEM

  • Steel/Brass/Aluminum/Copper etc.

  • Stamping

  • ISO9001:2008

  • Polishing/Zinc/Nickel Plated/Hot dip galvanizing o

  • As customer's request

  • 0.01mm

  • +/-0.01mm

  • ISO, GB, DIN, JIS, EN, ASTM, ASME

  • 100% inspection

  • Mechanical parts /End cap/Industrial/Electronic et

OEM Pipe Clamp , Metal Stamping Part

Competitive Price + Good quality guarantee+ On-time Delivery +Small order allowed

Material carbon steel(cold rolled steel sheet,galvanized steel sheet or tube),stainless steel, copper, brass, aluminum,etc.
Size According to customer's design or sample
Surface Treatment All kinds of surface treatment is available.polishing,zinc plating,nickel plating,chrome plating,powder coating,phosphate coating.
Machining Equipment Machining Center / CNC Lathes / Grinding / Milling / Lathes / Wire-cuts / Laser Cuts / CNC Shearing / CNC Bending / etc.
Mould

1.We make the toolings by ourselves according to customer's drawing or sample.

2.We send samples to customer to confirm first

3.We maintain freely for lifetime. 

Application Mechanical equipment,Industry,auto mobile Industry, etc.
 
Our Services

1. QUALITY:

All our factories are ISO 9001 certified. Some of them were awarded by ISO/TS16949, PED, etc. We also could provide RT, UT, MPI, WPS&PQR, etc. as per request.

 

2. PRICE

We have our own factory and 15 cooperative factories, so supply the best quality mechanical products with the most competitive prices.

 

3. DELIVERY TIME

We strictly executed the ETD we signed with customer, make sure to guarantee your delivery time.

 

4. SERVICE

We provide customized service,you can provide your drawing,and we can discuss it,then we can give you a  satisfactory answer.

 

5. NOTED

We will not only manufacture and source products for our customers, but also provide technical support, production all-time supervision and quality track service. Special request products available upon request.

Packaging & Shipping

Packing detail:   standard export packing, wooden cases, according to customer  

Delivery detail :   usually 30 working days, according to the volume 

OEM pipe clamp , metal stamping part

About Us

With the help of over 20 years manufacturing experiences in the field of oil & gas, mining, power generation, transportation industries, Shenyang New Densen Casting and Forging Co., Ltd. and its 15 factories would like to help our worldwide customers to supply the best quality mechanical products with the most competitive prices.

 

The product single weight could be from 0.01KGS TO100,000KGS. The processes could be casting, forging, stamping, machining, fabrication and assembly. The material could be various steel, iron and non-ferrous.

 

All our factories are ISO 9001 certified. Some of them were awarded by ISO/TS16949, PED, etc. We also could provide RT, UT, MPI, WPS&PQR, etc. as per request.

 

OEM pipe clamp , metal stamping part

 

 
 
Our Customers

New Densen's Worldwide Customers' Location

(by the end of 2015)

OEM pipe clamp , metal stamping partOEM pipe clamp , metal stamping part

OEM pipe clamp , metal stamping part

FAQ

FAQ:

Q Are you a manufacturer or a trader?

A We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.

Q What can you do for customer?

A One Stop Service

1).Manufacturing and supply various machinery parts.

2).Technical analysis and design

3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection.

Q How could you commit the product quality?

A 1) all our factories were ISO certified.

2) more than 50% of New Densen’s products were sold to worldwide top 500 companies which located in North American, Western Europe, and Japan.

3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.

Q What is your payment term?

A 1) Pattern and tooling: 50% prepaid as order deposit; balance 50% paid within 10 days after samples approved.

2) Sample: 50% prepaid as order deposit; balance 50% paid within 10 days after samples approved.

3) Product: 30% prepaid as order deposit;70% paid before EX-work.

Q How long shall we get the quotation?

A Processing time for inquiry: 1-3 working days.

Q What is your company product range?

A We are a professional customized mechanical components supplier.The process could be casting,forging,machining,stamping,welding,fabrication.The material could be iron,steel,non-ferrous etc.OEM and ODM are welcome.

Q Are your products are standard or non-standard?

A Mostly non-standard.Just send us your drawings and specifications,we will try our best to provide you a best scheme.

 

Contact us now!

 

Waiting for your inquiry at any time!

OEM pipe clamp , metal stamping part

 
 
 
 
 
 
 
Previous: 
Next: 

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer