contact@sydensen.com

loading

Share to:
sharethis sharing button

High Efficiency Disc Iron Ore Tailing Recycling Machine

Condition: New
Item: Magnetic separator iron ore
Color: as required
Capacity: as required
Type: Magnetic Separator
Min. Order Quantity: 1 Set/Sets
Supply Ability: 50 Set/Sets per Month
Port: Dalian
Payment Terms: L/C,T/T
Certification: ISO9001
Warranty: 12 month, 1 Year
After-sales Service Provided: Engineers available to service machinery overseas
Place of Origin: Liaoning, China (Mainland), Liaoning, China
Quantity:
  • CTS1015

  • JSYY

  • High

  • standard

  • 4.0kw

  • 1050x1500mm

  • depend on model

  • 60~700mT

  • 30~55t/h or 95m3/h

  • 28rpm

  • carbonate, manganese, oxide

  • Strong and weak magnet, such as ferr

Product Description
High Efficiency Disc Iron Ore Tailing Recycling Machine
Tailing recycling machine is the ideal equipment for iron ore recycling plant to recovery iron powder from iron tailing. Adopting a unique arrangement of the magnetic field AND featuring high efficiency in iron powder recycling, the economic benefits of iron ore separating plant are greatly advanced.
Features:
1. Stable machine body, and reasonable structure
2. Easy to operate, convenient to maintain, lower power consumption, and long service life.
3. According to the delivery capacity of user's tailing, the recycling machine can be divided into 4 unions, 6 unions, 8 unions, 9 unions, 12 unions, etc.
5. There are many diameter options of the recovery disk for users to choose, including 800mm, 1000mm, 1200mm, 1500mm and so on. 

Specification:
Types Specification Working Area(m2) Motor Power(Kw) Spindle Speed(rpm) Magnetic Foelds(GS) Handling Capacity(t/h) Weight(kg)
HSJ0808 φ800x8 12 5.5 1 1500 200 4500
HSJ1008 φ1000x8 15 5.5 1 1500 240 5000
HSJ1508 φ1500x8 20 5.5 1 1500 280 5500
HSJ1510 φ1500x10 25 5.5 1 1500 350 5800
High Efficiency Disc Iron Ore Tailing Recycling Machine
High Efficiency Disc Iron Ore Tailing Recycling Machine
Other products
High Efficiency Disc Iron Ore Tailing Recycling Machine
Packaging & Shipping
1. Packing: Export packing
2. Shipping time: 30 days after receive the deposit
High Efficiency Disc Iron Ore Tailing Recycling Machine
Our service
With well-equipped professional engineers and strong technical ability, our company has been in this field for 10 years.
1. We cooperate with superior suppliers (Nord &Schneider)to ensure the quality.
2. Tests of materials are freely checked for the required quality of the equipment before packing.
3. Engineers are always available to service for machinery commissioning overseas, which is not only after sales service support, but also technology support .
4."Keep Improving, Pursuing Excellence" would be kept forever.
High Efficiency Disc Iron Ore Tailing Recycling Machine
WORKSHOPS
High Efficiency Disc Iron Ore Tailing Recycling Machine
WHY BUY FORM US     
High Efficiency Disc Iron Ore Tailing Recycling Machine
FAQ
1. What is the MOQ of your machine?
A: Our MOQ is 1 set
2. How long is the machine warranty period?
A: The product warranty period is 12 months
 
 
Previous: 
Next: 

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer