loading

Share to:
sharethis sharing button

Densen Customized Jc-013 Cast 120h Aluminum Main Valve Upper Cover

Customized according to drawings
Colors can also be customized
logo can be customized
Availability:
Quantity:
  • Customized

  • Customized

photobank (1)

Densen Customized Jc-013 Cast 120h Aluminum Main Valve Upper Cover


Product Description

Description

Customized OEM Precision Casting  Aluminum High-speed Rail Train Parts

Type

High-speed Rail Train Parts/ High-speed Rail Train Accessories/ Train parts/ Train Accessories

Application

Railway, Train

Processing

Gravity casting/ permanent casting, die casting

Material

Aluminum

Tolernace

Controlled by ISO 8006 CT4-6

Design Support

Pro-E, UG,SolidWorks,AutoCad, PDF

Quality Control

Material, Dimension,Performance,inside defects,Balance test

Standard

ASTM,DIN,JIS,ISO,GB standards


Products show:

131

134

重力_02.1jpg_01-tuya重力_02.1jpg_02-tuya重力_03-tuyaxiangqingye_04应用领域机加工_06

Previous: 
Next: 

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer