contact@sydensen.com

Full welded ball valve body technology processing

Views: 3     Author: Site Editor     Publish Time: 2016-11-25      Origin: Site

You must have seen all welded ball valve body, all know welding joint are generally designed for thick wall narrow gap submerged arc welding, and all welded body mostly large thickness tubular welded joint.You must want to know is this why?
 
1: heat treatment technology
Thick wall multi-layer welding process is the process of metal material repeated heating and cooling, leading to the nonuniformity of welding joint organization and inferior, produce the high residual stress, and even produce welding defects.Welding is a process with the final after the product assembly, the valve cavity with nonmetal sealing material rubber and ptfe plastics, cannot undertake heat treatment after welding.
Full welded ball valve body technology processing
2: tapping processing
The body in the design of welding joint for alignment and positioning, in the presence of a ring of the weld root assembly gap, the gap under internal pressure and external load, will produce a few times the normal job stress of stress concentration, also make the engineers are difficult to deal with.
 
Fully welded ball valve body welding joint the root of the gap of stress concentration, residual stress, the organization of inferior become weak link in the body structure, is attention at home and abroad, but did not see any reports related to solve the problem, become a hidden danger of the boundary of this product structure integrity.

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer