Dry type magnetic separator is one of the indispensable equipment in the mineral processing equipment, is the material of magnetic characteristics of the ore concentrate can choose other production is extremely strong, widely used in particle size 3 mm below the magnetite, pyrrhotite, roasted ore and ilmenite wet magnetic separation of materials, also used in coal, non-metallic mineral, building materials and other materials in addition to iron.Very suitable for arid area.Dry magnetic separation machine in the process of production will meet motor fever phenomenon.Today, gongyi city xin di mining machinery factory, for everyone to introduce the cause of the dry magnetic separation mechanical and electrical machine fever.
 Fever that solve the magnetic mechanical and electrical machine
The cause of the dry magnetic separation mechanical and electrical machine overheating:
 
1. Magnetic bearing parts of the mechanical and electrical machine lubrication condition is bad, the friction heat;
 
2. The motor wiring adverse or switch attachment misconnection or wire break will result in higher abnormal motor calorific value;
 
3. The motor voltage is too low increased load leads to abnormal heat.
 
4. Bearing worn parts caused by friction heat;Motor fan leaf, gear and worm any parts of wear damage will strengthen its work calorific value;
 Fever that solve the magnetic mechanical and electrical machine
The cause of abnormal noise from the dry type magnetic separator are:
 
1. The poor lubrication bearing abnormal sound in operation;
 
2. Magnetic separator cylinder is material formation blocked or jammed phenomenon;
 
3. The bearing, fan leaf wear will produce abnormal sound.
 
In order to avoid abnormal electrical heating and abnormal sound, so you need to check the bearing lubrication situation of running parts, such as motor start to check the wiring is correct before, to found the wear loose parts timely maintenance after replace new parts, pay attention to during the process of producing magnetic separator feeding to continuous uniform, minimize clogging failure.

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer