contact@sydensen.com
KaiLong(Forging&Machining)
Relationship to New Densen: Sub factory
● Established in 2006 ● Located in Shenyang, China
● Factory area: 55,000 m2 ● Employee numbers: 150
● Annual capacity: 60,000 tons ● Processes:Forging, Machining
● Material handled: Iron,  steel, ● Certificates:   ISO9001:2008
kl brief product

Forging Work Shop
Densen-KL Forging factory has complete equipments, including gas producer, heating furnaces, hydraulic presses, hammers, ring rollers,etc..Biggest single forgings made can reach 30T or 15m length for shaft type parts, and 8m diameter for ring type parts
kl forging workshop
 Heat treatment Work Shop
kl heat treatment
Machining Work Shop
kl machining workshop
kl machining workshop2
Inspection equipments
kl inspection
Inspection equipments list
kl equip list4

Products show
forging ring

kl alex and shaft
kl shaft
kl gears
kl product
kl producti
more productionh

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer