The general requirements of welding procedure qualification

Views: 6     Author: Site Editor     Publish Time: 2016-10-18      Origin: Site

(1) welding procedure qualification should be based on reliable steel welding performance, and up until completion of the works.
Welding parameters used in the welding procedure qualification, in principle is according to the weldability of the steel welding test result to determine, especially after the heat input, preheat temperature and hot temperature.For weldability has been fully understand, there is a clear guidance of welding process parameters, and has long use in practice production in domestic and foreign mature steel grade, generally do not need to be done by construction enterprises weldability test.
The general requirements of welding procedure qualification
(2) the general procedure of welding procedure qualification:
For welding process procedure and welding specimens and test to test specimen and the specimen, determine whether the welding joint has required the use of performance to make the welding procedure qualification report to assess the proposed welding process instructions.
 
(3) equipment, instrument used in the welding procedure qualification should be in normal working state, steel, welding materials must conform to the corresponding standards, by this unit skilled welding workers have been using this unit welding equipment welding specimen.
The general requirements of welding procedure qualification
(4) management assessment work and comprehensive evaluation of welding and test results of personnel should be the welding engineer.
 
(5) after finishing the assessment data should be stated, and by the welding engineer to confirm the results.
The general requirements of welding procedure qualification
(6) after the examination and approval of the assessment data can be in the same quality management system in general.
 
The above is about the general requirements of welding procedure qualification related introduction, hope can help to you.
 

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer