contact@sydensen.com

How to prepare magnetic separator roller maintenance

Views: 4     Author: Site Editor     Publish Time: 2016-11-28      Origin: Site

 How to prepare magnetic separator roller maintenance

Magnetic separation pause if owners through the rare metal drum powerful magnetic filtered from the ores, as the most prone to wear and tear parts, magnetic separator drum drum surface as a result of the work has been in the process of mineral powder scour, wear is quite serious.
 
When magnetic separator roller severe wear, may result in bearing damage, even affect the whole beneficiation production line of normal production, therefore, on a regular basis for maintenance is to avoid magnetic separator magnetic separator drum drum the important condition of severe wear.Domestic well-known magnetic separator manufacturers hongxing machine for the maintenance of drum of magnetic separator mainly adopts the three ways.
 
1, small maintenance
 
According to their own conditions for small-scale maintenance should be performed once every six months.Specific maintenance content is: do not remove the cleaning barrel body gear, (cycloid gear or planetary wheel) and the support, parts and components, operation to replace oil cooling and lubrication, etc.
magnetic separator
2, moderate scale maintenance
 
According to the practical usage to ensure that at least once a year to maintain a moderate scale.Remove the bearing, the end cover, cylinder and transmission, cleaning cylinder body, check the gear, cycloid gear and bearing wear.Check the mechanical parts, keys, key whether deformation, oil seal for wear and tear, etc.
 
3, large-scale maintenance
 
Should be serviced once every two years.Maintenance including all components and the content of the inspection, repair or replacement, all oil-immersed electric cylinder oil, must be strictly in accordance with the instructions specified in the oil use, the user may not arbitrarily change the oil, to prevent motor burn out.
 
Magnetic separation machine maintenance and maintenance work, based on a regular basis, we have no time to manage, so to some potential problems and, in turn, to solve the problem in the largest extent, so it can in maximum extent, reduce the equipment failure caused by the economic losses.
 

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer