Views: 3 Author: Site Editor Publish Time: 2016-07-25 Origin: Site
In addition to the iron to be used in many industries, but the separator equipment should be how to choose?
Some things to consider the factors in choice except iron include: is conveyor belt conveyor, belt speed, bandwidth, angle, characteristics of grain size and the nature of the material humidity, properties, thickness, grain size, iron in the material contained in the weight, a ferromagnetic material, in addition to iron requirements, use of the environment (temperature, humidity, dust, corrosion of etc.), the machine itself, machine installation selected location etc..
When the iron content is more in the material, continuously and automatically except electromagnetic iron separator is the best choice. When the iron in the material in less content and manual unloading of iron suspension type electromagnetic iron remover, permanent magnetic separator is the best choice. When the ferromagnetic material in the material content, especially small, metal detector and strong magnetic self discharging electromagnetic, permanent magnet in supporting the use of iron is the best choice, themselves will be able to carry out monitoring and iron work, with energy saving, long service life, good effect of iron removal. In the use of hanging type electromagnetic, permanent magnet separator, such as material thickness and no magnetic parallel roller supporting the use, improve the removal rate. Can also be appropriate to reduce the height of the suspension, in order to achieve the desired effect of iron removal.
Q Are you a manufacturer or a trader?
A
We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
Q What can you do for customer?
A
One Stop Service
1).Manufacturing and supply various machinery parts.
2). Technical analysis and design
3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
Q How could you commit the product quality?
A
1) all our factories were ISO certified.
2) more than 50% of New Densen’s products were sold to worldwide top 500 companies
which located in North American, Western Europe, and Japan.
3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
Q How long shall we get the quotation?
A
Processing time for inquiry: 1-3 working days.
Q What's the process of developing a new steel casting product?
A
The procedure for new project develop as below:
1. Technical department analyze the drawings all details
2.Pattern design and manufacture
3.Casting Process
4.Quality Control inspect the casting parts
5.Issue inspection report for customer to check quality
6. After inspection report approved, Logistics Department help arrange the shipping to customer