contact@sydensen.com

For Diesel engine parts

DSC00465Our company mainly offers injectors, plungers, nozzles, delivery valves, pencil nozzles, repairing kits, common rail parts, hydraulic heads of VE distributor pumps and other related products for imported automobiles, construction machinery and marine products. With a batch of experienced professors, excellent machining systems, high level checking facilities, an effective quality control system and satisfactory after-sale service, we provide high quality products with good prices. Meanwhile, we passed ISO9001 certification in 2002.
 
Nowadays, we are paying attention to make products with drawings and samples from clients (OEM) to meet more and more overseas customers' requirements. The delivery time for plungers and valves is no more than 40 days. We also have a large stock for various kinds of models and types, and we are waiting for your enquiries at any time.
 
We sincerely welcome you to come to visit our company at your convenient time.



DSC00456

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer