contact@sydensen.com

loading

Share to:
sharethis sharing button

China OEM High Quality China Sand Machine Parts Casting Factory

Type: China OEM High Quality China Sand Machine Parts Casting Factory
FOB Price:US $5-10 / Set
Min. Order Quantity:2000Set
Supply Ability:10000Set/Sets per Month
delivery time:30days
piston ring weight:customized
Port:Dalian
Payment Terms: L/C,T/T, Western Union
Place of Origin: Liaoning, China (Mainland)
Availability:
Quantity:
  • DS

Product Description
China OEM high quality casting foundry sand machine parts

 asdjksadkasdaskjdhkas

 

Process

Material Grade

     Weight range

Application

Investment casting,

sand casting,

ESR casting

Die casting

Casting factory


Iron:

Grey iron, Ductile iron

Steel:

Carbon steel, Alloy steel,

Stainless steel

Nonferrous metal:

Bronze, Brass, Al, Zinc, Ti, etc.


From

0.01Kg to 100 ton

Auto motive,

agricultural machines,

vessels,

toolings, mining ,

oi l& gas machinery,

locomotive industry,

aerospace,

hardware,

contruction,

engineering machinery,

electrical equipment etc.

 HTB1bh0eHpXXXXcVXVXXq6xXFXXXq.jpg

 

Packaging & Shipping

Standard sea-worthy export packing

.png 

Company Information

Founded by 10 more factories and 1 trading company, headquartered in Shenyang, the heavy industry center city in China, Shenyang Densen Group of Companies (hereinafter referred as Densen Group) is a one of leading group mainly specialized in manufacturing and supply mechanical products. These products were wildly delivered to more than 100 countries and areas among the world, and were used well in the fields of oil & gas, agricultural, mining, vehicle, medical, machinery, resource, etc. Reference customers included Bridgestone, GE, Tesco, Fasco, Simens, etc. The turnover for Densen Group in 2015 was 60 million dollars. Currently, Densen Group is preparing to be listed on the stock exchange market.

         On the principle of ‘Quality and Service is Everything’, Densen Group has wined the faithful trust and support from worldwide customers. Densen Group will continue to work hard to help our respected customers to get high cost performance and one stop souring service and products. 

 

office01.jpg 

Specification

 HTB1iepiLpXXXXaeXVXXq6xXFXXX4.jpgHTB1TdVTLpXXXXchXFXXq6xXFXXXL.jpgHTB1WQI5LXXXXXXcapXXq6xXFXXXR.jpg 

FAQ

FAQ:


Q1:Are you a manufacturer or a trader?

We are manufacturer ,our own factory is located in Liaoning province,China


Q2:How do you protect customer's  right?

New Densen's work habit is to sign confidential agreement with own/outside factories all the time before start any project.
Also New Densen has signed confidential agreement with all its staffs. 


Q3:How long shall we get the quotation?

Processing time for Enquiries :1-3 days

Q4:What is your payment term?

Payment term:

1)Pattern and tooling: 50% prepaid as order deposit; balance 50% paid within 10 days after samples approved.

2)Samples: 50% prepaid as order deposit; balance 50% paid within 10 days after samples approved.

3)Products: 30% prepaid as order deposit;70% paid before EX-work.

Q5:Will we have the property of the tooling?

Yes,tooling's cost is one-time charge,the property of toolings will be yours after pay off all the charges.

Q6:What shall we do if the quality is not meet our requirement?

If that is the case after we re-test,we can repay the payment or re-produce until it reach the quality


Contact us

HTB1I24xHpXXXXcoXXXXq6xXFXXXe

huang


Previous: 
Next: 

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer