According to the need of the production of castings, advance preparation good casting and some of the chemical composition of the liquid metal or alloy.Then under the action of gravity or other force to injection mold liquid alloy materials, including filling is full and has important influence on the final quality of castings, especially for some complex shape, large wall thickness difference or easy oxidation of the alloy is more important.
 Casting mold production process
There are two basic liquid metal forming process: filling mold and cooling solidification.The two basic process can be completed in under the action of gravity field or other force.Filling mold (also known as casting) is primarily a speed change of mechanical process, cooling.
 Casting mold production process
Crystallization and solidification of liquid alloy material is the core problem of the formation process of castings, it largely determines the casting as-cast organization and the formation of some casting defects, because the material once solidified into a solid, almost in the subsequent processing other element method make quality has essentially changed, so the cooling and solidification of casting quality, especially the as-cast mechanical properties, plays a decisive role.Control during solidification to improve casting quality, obtain required by the organization and performance, is the important content of foundry technology.
 

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer