contact@sydensen.com

Casting mold parts processing

Views: 13     Author: Site Editor     Publish Time: 2016-11-29      Origin: Site

Casting mold parts processing

Part in all kinds of technical requirements on the one hand, influence on the performance of the parts work, on the other hand, is directly related to the economy and feasibility of the manufacturing process.What are often asked casting mold parts processing technical requirements, the following simple analysis.
 
1. The size precision of parts processing;
2. Precision parts processing shape;
3. The parts surface roughness;
Casting mold parts processing
4. Parts of all the position accuracy of the machining surface;
5. Parts hardness and heat treatment requirements;
6. Other special requirements.
 
Usually in the machining process, with improvement of casting surface machining precision, there is a will also get a finer surface roughness, but as the surface roughness is reduced, and to increase the total processing cost.As a result, the operator to determine the accuracy, first of all to ensure the parts performance requirements, but also to consider the process conditions and parts manufacturing costs, and many other factors.
 

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer