2023 A visit from our long-term customer!

Views: 52     Author: Site Editor     Publish Time: 2023-04-07      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button
2023 A visit from our long-term customer!

 

 On April 6,2023,we are warmly welcome a long-term customer as well as an old friend in Densen Group Headquarter office.

客户1

 

 On the morning of April 6, we accompanied the customer to visit SMTCL and have a detailed understanding of the equipment provided. It was a pleasure to exchange and learn with our customers together and take a group photo


  In the afternoon, we visited the factory of Densen Casting and introduced our fully automatic casting production, fully automatic heat treatment line, our strict and professional production process, which was well received by our customers.


客户3


  At the same time, we conducted an in-depth technical meeting on the products queried by customers, and discussed new materials, tolerances, processing techniques and inspection methods with the products.


  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer