contact@sydensen.com
http://www.sydensen.com/productcategory.html Hongyang(Casting&Machining)
 
Relationship to Densen Group: sub-factory
● Established in 2003 ● Located in Donggang, China
● Factory area: 10,000 m2 ● Employee numbers: 120
● Annual capacity: 3,000 tons ● Processes: Casting ,Machining
● Main product: hydraulic cylinder, cast iron casting, grey iron casting ● Certificates: ISO9001:2000
brief information

Working Scene         
Main scope: HTR, HMW, HCW, thread machining machine tool, casting machine tool, milling machine, forging machine tool, screw machine tool, casting machine tool, milling machine, forging machine tool, HTR, HMW, HCW, with professional level and mature technology.
working scene
working scene1
working scene3
working scene2
Inspection equipments
inspection

Products collection-Exhaust manifold
Exaust manifold
Products collection-HydraulicCylinder
Hydraulic cylinder
Products collection-Industry Machining Parts
Industry machine parts
Products collection-Manhole
Manhole

Products show
Product show
Product show1
more productionhttp://www.sydensen.com

  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer