contact@sydensen.com

Pipe welding will enter a "laser welding" era

Views: 20     Author: Site Editor     Publish Time: 2017-02-14      Origin: Site

On December 30, 2016, China petroleum pipeline bureau is responsible for the oil and gas pipeline girth weld of major progress was made in the laser/arc welding technology research, CPP became the first international attempt to oil and gas pipeline girth weld laser/composite welding arc used in long distance pipeline construction enterprises, pipe welding will enter a "laser welding" era.


On December 30, 2016, China petroleum pipeline bureau is responsible for the oil and gas pipeline girth weld of major progress was made in the laser/arc welding technology research, CPP became the first international attempt to oil and gas pipeline girth weld laser/composite welding arc used in long distance pipeline construction enterprises, pipe welding will enter a "laser welding" era.

welding

Scientific research personnel through five years of painstaking research, master the composite pipe laser/arc welding technology and key technology, test prototype developed is suitable for high grade, large diameter pipeline laser/arc welding equipment, this equipment has the advantages of compact structure, small volume, light weight, can lead the progress of our country's steel pipeline girth weld welding technology.Major technical characteristics of the study is to use laser/arc composite one-sided welding of large welding penetration, forming good, one-time welding layer thickness of thick advantages, combined with its high welding speed, reduce the number of pure electric arc welding filler layer and metal filling amount, thus greatly save stand-up welding time and weld material, the equipment investment, raise the efficiency and quality of pipeline welding construction, shorten the construction period, reduce construction cost.


At present, the oil and gas pipeline girth weld laser/arc welding machine prototype through continuous improvement, has industrial application conditions.


  • Q Are you a manufacturer or a trader?

    A
    We have our own foundry ,forging factory and machinery shop located in Liaoning Province, China.
  • Q What can you do for customer?

    A
    One Stop Service
    1).Manufacturing and supply various machinery parts.
    2). Technical analysis and design 
    3).Factory audit, on-site production supervision, in-time feedback, pre-shipment quality inspection
  • Q How could you commit the product quality?

    A
    1) all our factories were ISO certified. 
    2) more than 50% of New Densen’s products were sold to worldwide top 500 companies 
    which located in North American, Western Europe, and Japan.
    3) New Densen’s QC engineers will do on-site supervision and before EX-work quality inspection. New Densen will issue inspection reports for customers’ approval before EX-work. New Densen will be responsible for its reports and every parts no matter how long sold to customers.
  • Q How long shall we get the quotation?

    A
    Processing time for inquiry: 1-3 working days.
  • Q What's the process of developing a new steel casting product?

    A
    The procedure for new project develop as below:
    1. Technical department analyze the drawings all details 
     
    2.Pattern design and manufacture
     
    3.Casting Process
     
    4.Quality Control inspect the casting parts
     
    5.Issue inspection report for customer to check quality
     
    6. After inspection report approved, Logistics Department help arrange the shipping to customer